Production warehouse and an intelligent warehouse project and construction. Various studies were carried out to determine the load capacity of the slab since part of the process was to constantly move rolls of sheet and required for safety that the floor was completely leveled to avoid accidents with forklifts, natural lighting studies were also carried out to generate energy savings.